|
Comparison of the results of mathematical modeling of the attraction of the cathedral mountain "Cobra" with the results of full-scale tests. During the simulation, the maximum height of the train was determined after the passage of the track. The average discrepancy in the loss in height of the center of mass of the train after the passage of the path between the simulation results and full-scale tests is 0.42%.
more info...
|